1. Prepare preliminaries

Before starting any sort of apartment renovation project, you need to confirm the following:

  • Strata manager’s details
  • Basic budget. You’re clear on your ballpark budget for the project and communicate this to ensure a tailored solution

2. Phone consultation

A member of our team will book in a phone consult to find out a bit more about your project such as:

  • What is your vision?
  • What is your style?
  • What is your floor plan?
  • Does your apartment require layout changes to the floor plan?
  • Does your apartment require structural works?
  • When would you like to commence the project?
  • What’s your ballpark budget?
  • Do you require interior design services?

Duration of call: 30 minutes

3. Ballpark quotation

A member of our team will send you a ballpark quotation for your review and approval. This includes:

  • Our company profile
  • Strata approval process flow chart
  • Scope of works
  • Ballpark quotation

Lead time for ballpark quote: 48 hours

4. Onsite consultation

We will book in an on-site consultation ($250 + GST) to discuss:

  • Desired floor plans
  • Desired layouts
  • Desired level of finish
  • Desired timings
  • Desired budget
  • Discuss design and construct and construct options.

It’s also a great chance for you to raise any questions you may have and to get a feel for your designer and builder.

Duration of meeting: 60 minutes

5. Sign works contract

Our team will email you the final revised quotation and works E-contract (7 days after site visit) to sign and lock in a start date.

After receiving this, we ask that you sign the E-contract so that we can begin work on your submission right away.

Lead time for revised quote: 48 hours

6. Engineering plans

A member of our team and structural engineer will attend site to assess the integrity of walls required for removal.

Lead time for engineering plans: 1 week

7. Strata submission

Our team will submit the following on your behalf;

  • Strata application form
  • Renovation scope of works quotation
  • Basic design
  • Insurances and licences
  • Engineers report (if required)
  • By-laws drafted by our solicitor (if required)

Lead time for strata approval: 3-6 weeks

8. Design and materials purchasing phase

Whether you choose to do a construction only or design and construct arrangement, we will use the time during the strata approval to further outline the project.

  • Construction only (you guide the design)
    • Week 1: Scope review and define-your-vision meeting (you will be given a document to complete before the meeting)
    • Week 2-4: Scope refinement period
    • Week 5-6: Purchase materials
  • Design and construction (we guide the design)
    • Week 1: Scope review and define-your-vision meeting (with our interior designer)
    • Week 2-4: Scope refinement period
    • Week 5-6: Purchase materials

Steps 7 and 8 can be switched if the project requires it.

Lead time for design and materials purchasing: 3-6 weeks

9. Approval and build

Once we receive strata approval, we should have the design relatively refined and materials ordered and we will commence the exciting part; the build!

What sets us apart?

Free measurements, calculations, and consultation are provided
3D design using Photo Vision software
We provide a warranty on all cabinets up to 7 years
Cabinets are assembled from 16mm HMR board with full lining and 1mm PVC edge
Modern fittings are used for hinges, drawers, and legs
Cabinet cutting and edge processing is done using CNC and Edgebender
The average order execution time is 2-3 weeks, depending on the size of the work
A personalized approach to each client, taking into account their preferences and needs
AALBOR + BUILDERTREND

AALBOR + BUILDERTREND
Optimizing production to improve customer satisfaction

buildertrend
buildertrend-mobile

Buildertrend, a pioneer in customer project management software, has chosen this platform as the primary tool for customer interaction to improve service and project delivery.

With its customer portal feature, Buildertrend makes it easy to manage the design process, improving communication and customer satisfaction while minimizing the fluctuations that lead to costly design changes.

Buildertrend provides a system for simple and centralized communication, progress reports, invoices, and payments. With these features, customers improve their relationship with their builder and increase satisfaction with the project results.

Project information: documents, videos, photos
Daily progress reports
Changing orders and selections
Correspondence, messages and comments
Work performance guarantee
Viewing past and current invoices and payments